Road works on Wybong Road are being completed and weather permitting the works should be complete by the end of June. During this time works to be completed will be:
Schedule of works for the period 01/08/2009 to 11/09/2009 (6 weeks)
| Location |
Work Type |
Works |
| Spring Creek Bridge & Sandy Creek Bridge |
Bridge approach pavement works. |
Bridges approach to be sealed and concrete barriers and guard rail will be installed on each end of bridges by the end of August. |
| Castlerock Rd & Wybong Intersection |
Castlerock Rd Permanent Bus bay |
Earthworks and pavement works to be completed and re-opened to Public by end of August. |
| Approx. 1.5km From Bengalla Link Road towards to Sandy Hollow (before Sandy Creek Bridge) |
Box Culvert extension |
Both ends of box culverts to be extended approximately 3m, including new wing walls. |
| Approx 770m from Ridgelands Road towards to Sandy Hollow |
Culvert extension |
Approx. 3m either end of culverts to be extended with new wing walls. |
| Approx. 1.6km From Bengalla Link Road towards to Sandy Hollow |
Shoulder widening and Road Pavement Re-construction |
- Approx. 1.6km of Wybong Road will be reduced to one lane for shoulder widening and road pavement re-construction works in two stages (0.6km and 1km sections).
- Road works will be a maximum of 1km in length at any one time.During section works traffic lights will be in place at each end of the section to control single traffic flow.
- Upon completion of shoulder widening the entire road width will be sealed and opened for two-way traffic.A speed limit of 40km/per
|